About The Installation

Preparation requirements

  • Power supply : 3 cord cable (2,5 mm) from main DB to the place where the transformer is going to be installed. Separate for each heating zone.
  • Separate fuse for each heating zone
  • 2 cord (1,5 mm) cable from the transformer to the place on the wall where the thermostat is planned to be. (wireless thermostat excluded)
  • Cement screed on the floor or any solid, flat and leveled surface such as old tiles, cheaper tiles, etc)
  • Note: UFH system CAN NOT be installed directly on torba

About The Insulation